Starting January 2026, we have relocated to a brand-new 2,500 sqm vacuum cleaner production facility, just a 30-minute drive from the Ronlon grinder factory.
1st Floor – Metal Processing Line:
Laser cutting, rolling, bending, stiffening, welding, and polishing.
All parts are powder-coated at our dedicated painting facility, then transferred to the 2nd Floor – Assembly Line for final assembly.
With strong OEM/ODM capabilities, Ron......